Tender Enquiry

Chimney Flue Engineers invites tenders for the supply, installation, and commissioning of commercial and industrial flue and chimney systems.

Our projects aim to ensure the efficient and compliant evacuation of flue gases for these sectors. The systems must adhere to all relevant safety, environmental, and operational standards.

Speak to one of our tender enquiry team on 0118 467 2706 or email info@chimneyflueengineers.co.uk

Project Overview

The scope of work can encompasses the design, supply, installation, and commissioning of flue and chimney systems.

We as a contractor will be responsible for providing detailed engineering services, supplying all necessary materials and equipment, completing the installation, and conducting all required testing and commissioning to ensure full operational compliance. Comprehensive documentation and training for operational staff will also be required.

Scope of Work

We will be responsible for the following tasks:

  • Design and Engineering: Provide comprehensive design and engineering services tailored to the specific requirements of the project. This includes creating detailed design drawings and specifications.
  • Supply of Materials: Ensure the timely supply of all necessary materials and equipment for the project. All materials must meet the highest standards of quality and durability.
  • Installation: Execute the complete installation of the flue and chimney systems. Installation must be carried out in accordance with industry best practices and comply with all relevant safety regulations.
  • Testing and Commissioning: Conduct thorough testing and commissioning of the systems to verify compliance with performance and safety standards. This includes performing all necessary adjustments and optimizations.
  • Documentation: Provide all required documentation, including design drawings, test certificates, operation and maintenance manuals, and any other relevant documents.
  • Training: Conduct training sessions for the client’s operational staff, covering the use and maintenance of the flue and chimney systems to ensure proper operation and longevity.

Technical Specifications

The flue and chimney systems must meet the following technical specifications:

  • Material: Constructed from high-grade stainless steel or an equivalent corrosion-resistant material to ensure durability and longevity.
  • Standards Compliance: The systems must comply with EN 1856-1, EN 1856-2, or equivalent international standards.
  • Insulation: Feature double-walled construction with appropriate insulation to prevent heat loss and condensation.
  • Performance: Capable of handling flue gases at temperatures up to [Temperature]°C, ensuring efficient operation under varying conditions.
  • Durability: Designed for a lifespan of at least [Number] years under normal operating conditions, providing reliable service over the long term.

Submission Requirements

Interested parties are required to submit the following documents:

  • Company Profile: A detailed profile of the company, highlighting relevant experience and expertise in similar projects.
  • Technical Proposal: A comprehensive technical proposal that includes design details, materials, and demonstrates compliance with the specified requirements.
  • Financial Proposal: A detailed financial proposal with a clear breakdown of costs, ensuring transparency and accuracy.
  • Project Timeline: A proposed project timeline outlining key milestones and deliverables, demonstrating the ability to meet project deadlines.
  • References: At least three references from similar projects completed within the last five years, showcasing the company’s track record of success.

Evaluation Criteria

Tenders will be evaluated based on the following criteria:

  • Technical Compliance: Adherence to the outlined technical specifications and standards.
  • Experience and Expertise: Demonstrated experience in handling similar projects and the expertise of the team.
  • Financial Proposal: The cost-effectiveness and clarity of the financial proposal.
  • Project Timeline: The feasibility and realism of the proposed project timeline.
  • References: The quality and relevance of the provided references.